Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
risk:detailed_exposure:national_exp_model_chile_costs [2015/12/24 16:51]
Matias Hube
risk:detailed_exposure:national_exp_model_chile_costs [2016/04/21 10:25] (current)
Catalina Yepes
Line 1: Line 1:
-======Reposition ​costs per typology======+======Replacement ​costs per typology======
  
-The distribution of the total reposition ​costs per typology in each region is:+The distribution of the total replacement ​costs per typology in each region is:
  
 ^    Typology ​   ^  Region ​ ^^^^^^^^^^^^^^^ ​ Total  ^ ^    Typology ​   ^  Region ​ ^^^^^^^^^^^^^^^ ​ Total  ^
Line 18: Line 18:
 |Reinforced or confined concrete block masonry, 1-2 story houses| ​ 68|  426|  720|  154|  163|  147|  1,​351| ​ 183|  147|  94|  84|  5|  21|  16|  3|  **3,584**| |Reinforced or confined concrete block masonry, 1-2 story houses| ​ 68|  426|  720|  154|  163|  147|  1,​351| ​ 183|  147|  94|  84|  5|  21|  16|  3|  **3,584**|
 |Reinforced or confined concrete block masonry, 3 story buildings| ​ 0|  0|  5|  0|  0|  0|  202|  0|  0|  0|  0|  0|  0|  0|  0|  **207**| |Reinforced or confined concrete block masonry, 3 story buildings| ​ 0|  0|  5|  0|  0|  0|  202|  0|  0|  0|  0|  0|  0|  0|  0|  **207**|
-|Reinforced or confined concrete block masonry, 4-5 story buildings| ​  +|Reinforced or confined concrete block masonry, 4-5 story buildings|  ​0|  14|  3|  0|  0|  10|  38|  7|  45|  0|  0|  0|  0|  0|  0|  **118**| 
-|Timber houses| ​  +|Timber houses|  ​110|  285|  306|  135|  427|  2,​074| ​ 2,​785| ​ 465|  460|  2,​770| ​ 2,​107| ​ 960|  2,​367| ​ 239|  524|  **16,012**| 
-|Emergency houses| ​  +|Emergency houses|  ​2|  1|  1|  1|  2|  7|  21|  9|  12|  19|  3|  2|  2|  0|  0|  **83**| 
-|Adobe houses| ​  +|Adobe houses|  ​8|  10|  39|  71|  206|  358|  518|  419|  645|  162|  7|  0|  1|  3|  0|  **2,448**| 
-|Informal houses| ​  +|Informal houses|  ​0|  0|  0|  0|  0|  0|  0|  0|  0|  0|  0|  0|  0|  0|  0|  3| 
-|**Total**| ​ **+|**Total**| ​ **867**| ​ **2,​196**| ​ **4,​487**| ​ **1,​232**| ​ **4,​028**| ​ **11,​593**| ​ **54,​723**| ​ **4,​026**| ​ **4,​697**| ​ **10,​431**| ​ **4,​137**| ​ **1,​366**| ​ **3,​091**| ​ **362**| ​ **795**| ​ **108,​030**|
  
  
 [[risk:​detailed_exposure:​risk_chile|back]] [[risk:​detailed_exposure:​risk_chile|back]]
  • risk/detailed_exposure/national_exp_model_chile_costs.1450972273.txt.gz
  • Last modified: 2015/12/24 16:51
  • by Matias Hube